The vertical calciner is used in the production of calcined petroleum coke in our factory, and the corresponding national environmental protection policy is actively adopted. All the production and processing processes are equipped with environmental protection sewage treatment facilities, and waste gas recovery tanks and discharge pipes are installed. The tail gas is collected and treated by sewage pools, which has reached the national discharge standards. There are two production lines and five processing lines in the factory. They are equipped with raw material warehouse, processing warehouse and finished product warehouse respectively. The annual output is 30,000 tons.
Products are sold both at home and abroad.